GENERAL   EQUIPMENT   INC.                    

 

8724 Sunset Drive #191Miami FL 33173 · USA                                  

                                                  
Email:
info@generalequipment.infowww.generalequipment.info                                                       


 

 

147 MW POWER PLANT 

 

 

TYPE:

Power

DESCRIPTION:

147 MW Power Plant

PRICE:

Upon Request

PACKING:

As is, Where is

 

 

147 mw power plant


Subject unsold or market withdrawal


 

 

POWER TO THE PEOPLE !!!!!

 

For sale immediately:

 

Unbelievable deal , this opportunity will not come along again.....

1 unit  GENERAL ELECTRIC - complete dual fuel open gas power plant with 3 gas turbines

            147 MW fully performance

            Including stand-by Diesel emergency generator

YOB: 2004

Manufacturer: General Electric - US and Norway

Usage: 8.000 hours / excellent condition and instantly available

Heron is a 147 MW dual fuel open cycle gas turbine plant, which is in operation since 2004.

It was the first private power plant in Greece.

A stand-by diesel generator provides emergency power in case of PPC 20 KV power loss.

Thus, the power plant is capable of black-start operation.

The installation also include:

  • Natural gas filtering and pressure reducing station with two streams.

  • Natural gas preheating with heat exchanger and two hot water boilers.

  • Diesel oil storage facility with capacity 2500m³ providing inventory for 5 days operation in case that natural gas is not available.

  • Raw water storage facility with 2x1000m³ tanks and two deep well pumps with capacity 10 m³ /m & 20 m³ /hr each.

  • Demineralised water production plant with capacity 2x30 m³/hr.

  • One 500 m³ carbon steel tank with interior lining and six stainless steel tanks 100 m³ each for the storage of the demineralised water.

  • Two fire water pumps skids for raw and denim water. Each skid consists of one diesel pump, one electric driven pump and one jockey pump.

  • Fire detection and CO2 fire fighting systems for the Gas Turbine housings.

  • Main control building with 20 and 0,4 KV switch boards, MCCs, UPS and batteries and the central control room of the station.

Delivery: as is where is;

Delivery time: instantaneously after visiting

Payment: before loading, according the following installment plan:

30% Down payment after signing the sales contract within 10 days

70% before dismantling and shipping

Warranty: no

Reservation of title: until receiving the entire payment. Extended reservation of title is valid.

Further explanation:

This offer is a very good opportunity to safe almost 80% of the ordinary pricing of such kind of plant.

The supplier will send a team for supervising to the real purchaser for very fair conditions.

We hope to wake your interests in this matter.

 

SUPPLY SCOPE

Three LM 6000 Gas Turbines with Sprint Systems

Step up Transformers 11.5 KV / 150 KV 67,3 MVA

Auxiliary Transformers

4 distribution transformers

150 KV GIS substation for connection to grid, 6 bays

Black Start system diesel generator 1700KVA, MV & LV Switchgears, DC & UPS systems

Protection systems for generators. Transformers, LV & HV distribution systems

DSC system for power island and SCADA system for BOP

Field instrumentation, emission monitoring system and control system

Earthing and lightning protection

Fuel gas system, liquid system

Fire fighting system

Fire detection system

Main and aux. cable and pipe racks

Compressed air system, instrument air system

HVAC systems, demineralised and raw water systems

Effluent treatment plant, raw water and storage tanks

Small crane system

Plant size- 25.000m2

Main Fuel- Natural Gas

Secondary fuel-Light Fuel oil

Total Number Hours-6.500 from new

Base Load efficiency-37,85%

Output-147,762 MWISO conditions

Rate each unit-49,254 MWeach unit

Manufacturer- GE

Estimated construction period-9 months

Gas Consuption base load: 12.910Nm3/h per gas turbine

Gas Turbine, Gearbox & Generator are packaged, installed on a common concrete foundation.

Sound insulation enclosure covers all parts of the gas turbine the gearbox and the generator. Combustion exhaust gases the stack to atmosphere. All auxiliary systems

are installed on separate foundations beside the Gas Turbine:

• Lubrication system with tank, pumps and air-cooled oil cooler.

• Demineralised water injection system for NOx control and sprint water.

• Diesel oil injection pump.

• Natural gas final filter.

• Advanced system for the Gas Turbine starter.

• Generator 11,5 KV switchgear cubicle.

Power produced by the Generator is transmitted by buried 11,5 KV cables to the corresponding step-up transformer 67,3 MVA 11,5/150 KV.

The three step-up transformers are installed in a common fenced yard on steel rail fixed on a concrete foundation.

A water tight catch bridge has been constructed to receive the oil quantity of one transformer in case of an oil leak. Transformers are protected by deluge firefighting system using demineralised water.

The step-up transformers are connected to the 150 KV substation (GIS) through 150 KV buried cables.

Auxiliary power is provided by 20 KV grid of PPC through a 20/0,4 KV 1000 KVA transformer for each unit. A fourth transformer of the same power output provides power to the BOP auxiliary systems (diesel-oil unloading, transfer and treatment, demin-water system, compressed air, firefighting water pumps, natural gas GRS, etc).

A stand-by diesel generator provides emergency power in case of PPC 20 KV power loss.

Natural gas filtering and pressure reducing station with two streams.

Natural gas preheating with heat exchanger and two hot water boilers.

Diesel oil storage facility with capacity 2500m³ providing inventory for 5 days operation in case that natural gas is not available.

Raw water storage facility with 2x1000m³ tanks and two deep well pumps with capacity 10 m³ /m & 20 m³ /hr each.

Demin- water production plant with capacity 2x30 m³/hr.

One 500 m³ carbon steel tank with interior lining and six stainless steel tanks 100 m³ each for the storage of the demineralised water.

Two fire water pumps skids for raw and denim water. Each skid consists of one diesel pump, one electric driven pump and one jockey pump.

Fire detection and CO2 fire fighting systems for the Gas Turbine housings.

Main control building with 20 and 0,4 KV switch boards, MCCs, UPS and batteries and the central control room of the station

 

* please note: before inspection of power plant ->   L.O.I . And proof of funds required

 


 

150 MW POWER PLANT

 

 

Powerplant for sale  (NOTE 50 HZ)

 

 

PowerPlant


For Sale in Europe, delivery immediately

 

Including Dismantling and Transport to Sea Port  !!!

 

It’s possible to inspect the plant in Europe , location strictly only after  letter of serious interest on letterhead inspection by end buyer or authorized representatives only NOT by Brokers 

 

 

We Offer: Complete Powerplant

 

Totally 150 Mw

 

Delivery immediately ,

 

The Power plant is out of operation since december 2012

 

Since that moment precautions are taken to ensure that the equipment of the power plant stays in its perfect condition.

 

The plant consists of one direct fired boiler installation, heavy fuel oil (HFO) and gas turbine.

 

In 1988 the GT13E gas turbine has been taken into operation.

 

The new EV burner unit has been installed in 1996.

 

A new and modern digital control system was Installed several years ago.

 

USED GAS TURBINE

Stays in its perfect condition.

The plant consists of one direct fired boiler

Installation, heavy fuel oil (HFO) and gas turbine.

The gas turbine, the boiler can be operated separately

The boiler turbine were commissioned In 1988 the GT13E gas turbine has been taken into Operation.

The new EV burner unit has been installed in 1996.

A new and modern digital control system is installed several years ago.


FOR SALE GAS TURBINE 02

Gas Turbine:

Manufacturer: Alstom/ABB, Model GT13E

Capacity: 150,000 kW (150MWE/18,5 MVA, cos phi 0,8)

Frequency: 50 Hz

Year: 1988

Speed: 3000 RPM

Fuel: Gas

Last C-inspection: 2004

Hours: OH 66.200 EOH 95.644 Starts 1.456

Trips 296

Emission: NOx 75 mg/Nm3

Efficiency: 34.56%

Additional equipment Kawasaki Ammonia De-Oxidation Method, DLN Combustor

Technology, EV Type Burners. Misc.spare parts.

Note: New EV burner unit has been installed in 1996.

Fuel: Gas

Frequency: 50 Hz

Transformers:

GT trafo: 21KV -> 163KV

EB trafo: 10KV/ 3KV/ 400V en 35 MVA

HFO sec.6500 RI/37 grdC / max S 2%.

Burnertype: Dual fuel: Tangential arrangement

Fuel: LC gas, HC gas, LC gas-oil, HC gas-oil

Permit Power: 599 MW

Characteristics

Power output depends on air and cooling water temperature. Therefore temperature curves Are set for planning Purposes.

Properties

The calling time is the time needed for a Powerplant to come standby and is downtime Dependable.

The start time is the time needed to come from standby to parallel and is also downtime Dependable.

Control Restrictions (Regelrestricties or Ramping)

Per specified call time control restrictions are given. Once a unit delivers power, for all start Types maximum

Control restrictions apply. The maximum control restrictions are noted points in time and net Power output.

The maximum control restrictions are valid if the unit is ramped up to its maximum. In the Ranges between The dictated points, more points can be described.

Shutdown Restrictions

Shutdown a unit regularly can be done in respect to two aims, I.e. Being available for Production as fast as Possible or being available for maintenance as fast as possible. We distinguish therefor two

Types of shutdown:

Shutdown Warm,

Shutdown Cold

The stop procedures describe from a specific amount of power output which special Restrictions occur. The Format equals the format of the control restrictions.

Sliding Heat Curve (GWK) per 1-1-2003

P = netto opwek in [Mwe]

Q = warmtelevering (5min waarde) [MWth]

Tkw = Koelwatertemperatuur inlaat KK

Tbl = Buitenluchttemperatuur

WvB = Warmteverbruik

SWvB = Specifiek warmteverbruik

 

Specification and photos are not contractual and are subject to verification upon inspection

 

TAKE NOTICE!

 

PLEASE BE ADVISED THAT INFORMATION INCLUDED IS CONFIDENTIAL IN NATURE AND IS BASED ON PRE-EXISTING BUSINESS RELATIONSHIP WITH THE LEGAL OWNER OF PROPERTY DESCRIBED HEREIN (IF APPLICABLE). AS SUCH, UPON RECEIPT OF SAID INFORMATION THE RECEIVER ACKNOWLEDGES THAT ANY UNAUTHORIZED CONTACT WITH SAID LEGAL SELLER WILL BE CHARACTERIZED AS A BREACH OF CONFIDENTIALITY AND SAID AGREEMENT MAY BE ENFORCED UNDER EXISTING LAW OR IN EQUITY.

 

This paper was prepared by General Equipment Inc.
The paper represents an offer of a partner of General Equipment Inc.
All rights are reserved by and for General Equipment Inc.
All content and ideas of this paper are the property of General Equipment Inc.